Reflective striping was added to the truck during the past week.
|
|
Reflective striping was added to the truck during the past week.
|
|
|
Reflective striping was added to the truck during the past week.
|
|
Reflective striping was added to the truck during the past week.
|
|
|
The rear wall of the crew cab interior now has a metal peg board installed, which will help mount equipment inside the cab.
|
|
The aerial ladder was delivered from Kewaunee Fabrications in Kewaunee (WI) to Pierce's Aerial Assembly building in Appleton (WI).
|
|
|
Once the aerial ladder has been fully assembled, it will be mated onto the chassis and body of our truck and begin aerial ladder testing.
|
|
|